Friday 25 February 2011

Conclusion

This SKE assignment has been a challenge and an opportunity to acquire more CAD/CAM knowledge. The final product meets my specification  and is a good outcome of the design brief analysis. However, there are a few things I could have done differently the second time round. These are:

1. Make the whole casing much bigger to comfortably accommodate all components with enough space left
    to manouver in case of any repairs/adjustments.

2. Have a better way to join the speaker, the casing and the speaker cover together.

3. Make the casing walls thicker to enable bigger surface contact between the two halves for a stronger joint.


 This would have made the use of a "fin" unnnecessary.
  

No comments:

Post a Comment